Apply for an additional residential meter connection

Where a subdivision is not proposed, an additional metered service may be required for a dual occupancy or a granny flat.

Available options include:

  • One (1) additional standard 20mm metered service
  • One (1) 25mm metered service
  • One (1) 25mm service line with manifold (2 x 20mm meters)

NOTE: All meters connected to a property will incur availability and water usage charges. Refer to our metered services comparison guide for details on ongoing quarterly costs.

Subdivision requirements

For Torrens title subdivisions, each dwelling must have a separate standard 20mm meter.

For Strata, Community or Neighbourhood title subdivisions, individual meters are also required but these meters may be configured on a manifold.

Metered service connection requirements will be stated on your Water Development Notice. 

Metered services comparison guide

To assist you in understanding ongoing dual occupancy fees and charges, the below table provides a breakdown of current charges based on 2 x 20mm meters vs. 1 x 25mm meter.

Fees per service 2 x 20mm 1 x 25mm
Quarterly water availability charge $88.00 $73.50
Quarterly sewer availability charge $599.50 $417.75
Water usage charge* (80kl x $3.03) $242.40 $242.40
Sewer usage charge* (80kl x 0.90 x $2.65) - $190.80
Total quarterly amount charged $829.90 $924.45

Note: This table represents a quarterly water usage of 80kl in total (in either scenario). This amount is variable to the amount of water that goes through the meter. 

* Water usage charge is based on the water recorded during the period multiplied by the water rate; the sewer usage charge is based on the water used multiplied by the discharge factor for dual occupancy and sewer use rate.

 

How to apply

Click on the below tabs to find out what you need, how to apply, and what happens next.

Before you apply

Step 1.Have your development reference number ready

When you apply for an additional water meter, you will be asked to provide your Water Development Notice reference number (e.g. DA24/1234).

Step 2.Prepare your documentation before you apply

When applying for an additional water meter connection, you’ll need to upload a Service Location Plan — a simple diagram showing where you’d like the additional meter installed. This helps us position your meter correctly and efficiently. 

Location requirements

Please ensure your nominated meter location:

  • Is positioned along your front boundary, and
  • Is no more than 1 metre inside the front boundary line.

You can upload your Service Location Plan in JPG or PDF format during the application process.

Important note - In some cases, conduit for a long service may already be installed, connecting to a water main located on the opposite side of the street. If your preferred meter location doesn’t align with the existing conduit, additional installation costs may apply. If this happens, we’ll contact you to discuss the costs and explore alternative location options.

How to apply

Complete the online application form

Have your Water Development Notice reference number (e.g. DA23/1234) and Service Location Plan ready to upload when prompted.

The link below will take you to Council's online request management platform.

Apply online

Please be advised: Due to an influx of connections, an underbore installation will take a minimum of 30 business days.

What happens next

Step 1.Application review

On receipt of application, we will review your Service Location Plan and if viable, issue a payment advice (invoice).

Full payment must be made prior to works commencing.

Step 2.Meter installation

On receipt of payment, we will install the additional meter in accordance with the approved Service Location Plan (or agreed alternative) within approximately 20 business days. To avoid delays, the site must have a minimum two (2) metre clearance at the installation point.

Please note that weather and site conditions may cause delays beyond the estimated timeframe.

Step 3.Connection to dwelling

All internal pipes on the property including taps and drains, are the property owner’s responsibility. Once the meter has been installed, the property owner or builder must engage a licensed plumber to connect the metered service to the dwelling.

Should a meter be damaged or interfered with, charges may be issued to the property owner.

Need help?

Need help? Contact us today

Call us on (02) 4429 3214 or visit your closest administration centre

Nowra Administration Centre
Opening hours: Monday to Friday, 9:00am to 4:00pm
36 Bridge Road, Nowra NSW 2541

Ulladulla Branch Office
Opening hours: Monday to Friday, 10:00am to 2:00pm
14 Deering Street, Ulladulla NSW 2539

Service location plan example

Here is an example of a service location plan for an additional metered service for a dual occupancy or granny flat.

Please be reminded that your preferred location must be along the front boundary of the property. 

If your preferred location does not line up with an existing conduit, we will contact you to discuss costs and possible alternative service location options.

example service location plan for dual occupancy