Notify us of a non-urgent issue via our online form
Commercial and industrial developments often require larger water service connections than standard residential properties.
Our metered service connections are available in sizes ranging from 20mm to 100mm. Connections greater than 100mm are available upon request.
Examples of commercial uses include:
Steps to apply
Click on the below tabs to find out what you need, how to apply, and what happens next.
When you apply for a commercial water meter, you will be asked to provide your Water Development Notice reference number (e.g. DA24/1234).
When you apply for a commercial meter connection, you will be asked to provide:
A Service Location Plan is a simple diagram that provides us the information we require to install the meter in the position you want. Your nominated location must:
You can upload your Service Location Plan and Hydraulic Plans in JPG or PDF format during the application process.
Please note: In some cases, conduit for a long service may already be installed connecting to a water main that is located on the opposite side of the street. If your preferred location does not line up with the existing conduit, additional conduit installation costs will be incurred. In this instance we will contact you to discuss costs and possible alternative service location options.
Have your required documentation such as Water Development Notice reference number (e.g. DA23/1234), Service Location Plan, and Hydraulic Plans and Water Sizing Calculations ready to upload when prompted.
The link below will take you to Council's online request management platform.
Apply online
Please be advised: Due to an influx of connections, an underbore installation will take a minimum of 30 business days.
On receipt of application, we will review your Service Location Plan and Hydraulic Plans and if approved, issue a payment advice (invoice).
Full payment must be made prior to works commencing.
On receipt of payment, we will install the meter in accordance with the approved Service Location Plan (or agreed alternative) within approximately 20 business days. To avoid delays, the site must have a minimum two (2) metre clearance at the installation point.
Please note that weather and site conditions may cause delays beyond the estimated timeframe.
All internal pipes on the property including taps and drains, are the property owner’s responsibility. Once a meter has been installed, the property owner or builder must engage a licensed plumber to connect the metered service to the premises.
Should a meter be damaged or interfered with, charges may be issued to the property owner.
Call us on (02) 4429 3214 or visit your closest administration centre
Nowra Administration Centre Opening hours: Monday to Friday, 9:00am to 4:00pm 36 Bridge Road, Nowra NSW 2541
Ulladulla Branch Office Opening hours: Monday to Friday, 10:00am to 2:00pm 14 Deering Street, Ulladulla NSW 2539
Here is an example of a service location plan for a commercial premises.
Please be reminded that your preferred location must be along the front boundary of the property.
If your preferred location does not line up with an existing conduit, we will contact you to discuss costs and possible alternative service location options.
Hydraulic plans or water sizing calculations must be prepared by a qualified professional - such as a licensed plumber or hydraulics consultant - in accordance with relevant Australian Standards.
Plans may include:
Plans and calculations can be uploaded with your application in a JPG or PDF format.