If your multi-dwelling development requires two (2) or more standard (20mm) meter connections, then you will require a manifold installation. The size of the manifold will depend on the number of meter connections required.
Manifold meters can be a staged installation. This is useful for developments that may not require all meters to be connected at once. This option can be selected within your installation request.
Steps to apply
More information
Once the meters have been installed:
- The property owner or builder must engage a licensed plumber to connect the meters to the dwellings.
- All internal pipes on the property including taps and drains, are the property owner’s responsibility.
Should a meter be damaged or interfered with, charges may be issued to the property owner.